Earlier this week, while I was working at my desk, I looked up and saw this:
Whoa. Now that’s a view! It kind of scared me. But, the good news is that this view means we are cleaning up the old driveway, and the “palm” trees, so that we can have our new driveway put in. Once the driveway is in it will look like we have an entirely new house. I hope. Here are some more pictures of the old asphalt going bye-bye:
And, while work is going on in the front (or, the street side – we can never figure out what is the front and what is the back), work is also going on in the back – or lake side.
We have finally decided to go ahead and have the deck built with a composite material. After going back and forth between the cost of building an 850 square foot deck out of composite, and building it the way we really want it and the way that will last the longest, we said the heck with it and went for it. Might as well do things right the first time, right? Now instead of cleaning and sealing the deck every spring we will be enjoying it.
Monday was a busy day. People were swarming. Along with the front and the back being worked on, we also had people working on the inside. The plumbers were back and now we have this in the basement:
Let there be hot water.
We did lose something. The trim guys finished up last week, packed up their trailer, and, poof!, they’re gone. Here are a few pictures of what they left behind:
If you noticed, in the picture above, we have our dining room table in our dining room! We ate our first dinner there over the weekend – hot dogs and baked beans! In closing, here are the pictures I’ll leave you with. Hopefully the first picture in the next post will be the completed driveway!
Looks stunning. Lovely details.
LikeLike